I have an old hard wired Lutron scene lighting system that I plan to replace with zwave switches and control pads so I can integrate it with my HS system. In HS lighting product literature, I see references to two ways of controlling light settings: scenes or events. I well understand HS events and can imagine how pressing a control pad button triggers an event that sets selected light devices to desired levels. But, the various lighting references to "scenes" make me think it is a different process and I just can't figure out how the scene process differs from an event and what the advantage is, if any.
Announcement
Collapse
No announcement yet.
Scene primer
Collapse
X
-
Scene primer
Last edited by Sheriff; February 25, 2016, 08:15 AM.HS4Pro on Windows 10
One install with 2 Ethernet Z-nets
2nd install with 1 Ethernet Z-net
300 devices, 250 events, 8 scripts
6 CT-100 tstats
Serial IT-100 interface to DSC Panel with 8 wired zones
18 Fortrezz water sensors & two valve controlsTags: None
-
Answered!
Tyler straightened me out; I'm posting his answer for future generations. If you do not run Homeseer, "Scenes" is a means of programming the control pad to control designated z-wave light devices directly. If, however, you are on a Homeseer network, the preferred means of controlling specific fixtures via the control pad would be by building "events".HS4Pro on Windows 10
One install with 2 Ethernet Z-nets
2nd install with 1 Ethernet Z-net
300 devices, 250 events, 8 scripts
6 CT-100 tstats
Serial IT-100 interface to DSC Panel with 8 wired zones
18 Fortrezz water sensors & two valve controls
-
Want to play more with scenes? Then try this plugin out:
http://www.mikemackonline.com/homese...ster_info.html
Eman.TinkerLand : Life's Choices,"No One Size Fits All"
Comment
-
Guest
Originally posted by Sheriff View PostTyler straightened me out; I'm posting his answer for future generations. If you do not run Homeseer, "Scenes" is a means of programming the control pad to control designated z-wave light devices directly. If, however, you are on a Homeseer network, the preferred means of controlling specific fixtures via the control pad would be by building "events".
Comment
Comment