www.homeseer.com    
 

Go Back   HomeSeer Message Board > HomeSeer Products & Services > HomeSeer Help

HomeSeer Help Help, How-to's and Documentation

Reply
 
Thread Tools Display Modes
  #1  
Old May 2nd, 2017, 01:01 PM
s389j s389j is offline
Seer
 
Join Date: Dec 2016
Location: Massachusetts
Posts: 5
Any way to schedule events for certain days?

Hi,

I have HS setup at a vacation rental property. Is there a way to setup events to run on certain dates? We used to have Vera there and we would setup something like "2 hours prior to checkin" and it would turn on the fridge and central air and drop in the renters user code into the lock.

I am just not seeing anyway to do it through HS unless I am missing it. I also checked the how to section with no luck

Thanks in advance!
Reply With Quote
  #2  
Old May 2nd, 2017, 01:19 PM
rprade's Avatar
rprade rprade is offline
OverSeer
 
Join Date: Jan 2014
Location: Colorado
Posts: 5,771
Quote:
Originally Posted by s389j View Post
Hi,

I have HS setup at a vacation rental property. Is there a way to setup events to run on certain dates? We used to have Vera there and we would setup something like "2 hours prior to checkin" and it would turn on the fridge and central air and drop in the renters user code into the lock.

I am just not seeing anyway to do it through HS unless I am missing it. I also checked the how to section with no luck

Thanks in advance!
Use the time as a trigger and the Date or Day as a Condition.
__________________
Randy Prade
Aurora, CO
Prades.net

"Do or do not, there is no try"
-Yoda

PHLocation - Pushover - EasyTrigger - UltraECM3 - Ultra1Wire3 - Arduino
Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Delayed events/event actions stop after 14 days JimBob HS3 / HS3PRO Discussion 18 November 13th, 2017 10:21 AM
Run and schedule events are delayed by minutes ez1976 HS3 / HS3PRO Discussion 7 October 8th, 2014 05:17 PM
?way to record days events to use for vacation schedule Ross HS2 / HSPRO 4 March 31st, 2010 10:36 AM
Speaker VR wants to schedule all events in the future scotsglen HS2 / HSPRO 5 December 11th, 2006 02:35 PM


All times are GMT -4. The time now is 08:01 AM.


Copyright HomeSeer Technologies, LLC