Let me explain what happened...
1. I initially had three HS-PA100+ added to my system as Nodes 2, 3 and 4. Node 1 was the ZEE controller.
2. Somewhere along the way I removed all of the nodes and then added them back in.
3. HomeSeer skipped Node 3 when I started to add them back in.
4. I now have Nodes 2, 4, 5, 7 and 8 assigned to the five HS-PA100+. Node 6 is assigned to a Z-NET Z-WAVE Network Interface.
Questions:
1. Is there any problems with skipping a node address?
2. Can I re-address my existing nodes to "pack" them sequentially? Is this necessary?
1. I initially had three HS-PA100+ added to my system as Nodes 2, 3 and 4. Node 1 was the ZEE controller.
2. Somewhere along the way I removed all of the nodes and then added them back in.
3. HomeSeer skipped Node 3 when I started to add them back in.
4. I now have Nodes 2, 4, 5, 7 and 8 assigned to the five HS-PA100+. Node 6 is assigned to a Z-NET Z-WAVE Network Interface.
Questions:
1. Is there any problems with skipping a node address?
2. Can I re-address my existing nodes to "pack" them sequentially? Is this necessary?
Comment